Project Profile
Aegis Living Laurelhurst
PROJECT OVERVIEW
New assisted living community created in NE Seattle
Based on prior projects with the general contractor’s team, Snyder was brought in as a trusted partner to provide cost sensitive solutions for the project’s below-grade and pedestrian areas. Our scope on this project included below-grade vertical sheet waterproofing, hot rubberized waterproofing, and traffic coatings. Scopes in these areas require the need to coordinate closely with others, proactively identify potential performance issues, and provide timely solutions. Because of our strong partnership with the manufacturers specified for this project, we were able to ensure those needs were met and the Owner was provided with reliable system to reduce the potential for water entry into the structure.
Project Type
Residential Neighborhood – Senior Living
Project Highlights
- Installation of vertical below-grade waterproofing during an extremely wet seasonal period combined with less than ideal site conditions.
- Maintained close collaboration working as a liaison between the design team and manufacturer to ensure the correct details were provided and installation was approved prior to being covered resulting in a strong assurance in the installation of our scope.
LET'S TALK
Have a question? Need a project estimate?
We’d be happy to return an email or take your call.